| Air Shark Project Update | |
|---|---|
This page and the linked pages that follow provide a record of the progress made on this project. The following is a brief summary of our activities since January of 2007. You can click on each picture to view a larger version in a new window. |
|
The plane was sitting on a raised dolly in the back of a hangar in Green Bay |
The stand was cut down and the fuselage was readied to be cut down as well |
A line was drawn marking the separation point |
Following the cut, Dan Fulweiler cleaned out the dust |
Ron Marto held the tail section following the cut |
With the cut made, the plane was ready to load up for the trip to Sturdgeon Bay |
Loading the fuselage turned into quite a project all by itself. You can see details of the that portion of the project here.
|
|